Effect of pre-tensioned rock bolts on stress redistribution around a roadway—insight from numerical modeling
- 31 December 2008
- journal article
- Published by Elsevier BV in Journal of China University of Mining and Technology
- Vol. 18 (4), 509-515
- https://doi.org/10.1016/s1006-1266(08)60285-0
Abstract
No abstract availableKeywords
This publication has 3 references indexed in Scilit:
- Numerical Simulation of Rock Burst in Circular Tunnels Under Unloading ConditionsJournal of China University of Mining and Technology, 2007
- Bolt length requirement in underground openingsInternational Journal of Rock Mechanics and Mining Sciences, 2007
- Back analysis for tunnelling induced ground movements and stress redistributionTunnelling and Underground Space Technology, 2005