The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- 1 June 1998
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 107 (2), 250-259
- https://doi.org/10.1016/s0377-2217(97)00331-7
Abstract
No abstract availableKeywords
This publication has 20 references indexed in Scilit:
- Heuristics for scheduling projects with resource restrictions and several resource-duration modesInternational Journal of Production Research, 1993
- NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULINGIIE Transactions, 1993
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling ProblemManagement Science, 1992
- Some efficient multi-heuristic procedures for resource-constrained project schedulingEuropean Journal of Operational Research, 1990
- Project scheduling with resource constraints: A branch and bound approachEuropean Journal of Operational Research, 1987
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project SchedulingManagement Science, 1975
- Critical Path Problems with Concave Cost-Time CurvesManagement Science, 1972
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost FunctionsManagement Science, 1964
- Critical-Path Planning and Scheduling: Mathematical BasisOperations Research, 1961
- A Network Flow Computation for Project Cost CurvesManagement Science, 1961