Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant
- 3 October 2008
- journal article
- research article
- Published by American Chemical Society (ACS) in Energy & Fuels
- Vol. 22 (6), 4259-4264
- https://doi.org/10.1021/ef8004042
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Thermo-economic analysis for the optimal conceptual design of biomass gasification energy conversion systemsApplied Thermal Engineering, 2009
- Optimization of biomass fuelled systems for distributed power generation using Particle Swarm OptimizationElectric Power Systems Research, 2008
- Combustion characteristics of different parts of corn straw and NO formation in a fixed bedBioresource Technology, 2008
- Effect of Corn Stalk Length on Combustion Characteristics in a Fixed BedEnergy & Fuels, 2008
- A review on the development and commercialization of biomass gasification technologies in ChinaRenewable and Sustainable Energy Reviews, 2004
- Combustion characteristics of different biomass fuelsProgress in Energy and Combustion Science, 2004
- Test Results and Operation Performance Analysis of a 1-MW Biomass Gasification Electric Power Generation SystemEnergy & Fuels, 2003
- Design and operation of a CFB gasification and power generation system for rice huskBiomass and Bioenergy, 2002
- A techno-economic comparison of power production by biomass fast pyrolysis with gasification and combustionRenewable and Sustainable Energy Reviews, 2002
- An economic analysis of biomass gasification and power generation in ChinaBioresource Technology, 2002