Long-term stability of a backfilled room-and-pillar test section at the Buick Mine, Missouri, USA
- 1 October 2009
- journal article
- Published by Elsevier BV in International Journal of Rock Mechanics and Mining Sciences
- Vol. 46 (7), 1182-1196
- https://doi.org/10.1016/j.ijrmms.2008.11.010
Abstract
No abstract availableThis publication has 5 references indexed in Scilit:
- Field monitoring of salt tailings used as backfill in cut-and-fill potash miningPublished by Informa UK Limited ,2021
- Utilization of salt tailings backfill at Denison-Potacan Potash CompanyPublished by Informa UK Limited ,2021
- Post-failure behavior of two mine pillars confined with backfillInternational Journal of Rock Mechanics and Mining Sciences, 2003
- Applicability of the geological strength index (GSI) classification for very weak and sheared rock masses. The case of the Athens Schist FormationBulletin of Engineering Geology and the Environment, 1998
- Prediction of room closure and stability of panel 1 in the Waste Isolation Pilot PlantInternational Journal of Rock Mechanics and Mining Sciences, 1997