Simulation studies of multilevel dynamic job shop scheduling using heuristic dispatching rules
- 31 December 1992
- journal article
- Published by Elsevier BV in Journal of Manufacturing Systems
- Vol. 11 (5), 346-358
- https://doi.org/10.1016/0278-6125(92)90063-l
Abstract
No abstract availableThis publication has 10 references indexed in Scilit:
- Performance forecasts as feedback for schedule generationJournal of Manufacturing Systems, 1992
- A multilevel multilayer framework for manufacturing controlJournal of Intelligent & Robotic Systems, 1991
- Job shop scheduling with alternative machinesInternational Journal of Production Research, 1990
- Sequencing with Earliness and Tardiness Penalties: A ReviewOperations Research, 1990
- Part routing in flexible assembly systemsIEEE Transactions on Robotics and Automation, 1990
- Integration of priority dispatching and due-date assignment in a job shopInternational Journal of Systems Science, 1988
- Priority Rules for Job Shops with Weighted Tardiness CostsManagement Science, 1987
- Sequencing Rules and Due-Date Assignments in a Job ShopManagement Science, 1984
- Leader-follower strategies for multilevel systemsIEEE Transactions on Automatic Control, 1978
- A Survey of Scheduling RulesOperations Research, 1977