An Algorithm for Scheduling a Large Pumped Storage Plant

Abstract
The Michigan Electric Coordination Center (MEPCC), operated by Consumers Power and Detroit Edison Companies, has the responsibility for scheduling the Ludington pumped storage plant. Ludington has an extremely large economic effect on the Consumers Power and Detroit Edison Companies' system due to its size (over 1800 MW net demonstrated generating capability). This paper presents a dynamic programming algorithm for scheduling large pumped storage plants and shows how this method can be coordinated with the commitment of the thermal units of the system.

This publication has 5 references indexed in Scilit: