Monitoring the Rapid-Moving Reactivation of Earth Flows by Means of GB-InSAR: The April 2013 Capriglio Landslide (Northern Appennines, Italy)
Open Access
- 17 February 2017
- journal article
- research article
- Published by MDPI AG in Remote Sensing
- Vol. 9 (2), 165
- https://doi.org/10.3390/rs9020165
Abstract
This paper presents the main results of the GB-InSAR (ground based interferometric synthetic aperture radar) monitoring of the Capriglio landslide (Northern Apennines, Emilia Romagna Region, Italy), activated on 6 April 2013. The landslide, triggered by prolonged rainfall, is constituted by two main adjacent enlarging bodies with a roto-translational kinematics. They activated in sequence and subsequently joined into a large earth flow, channelizing downstream of the Bardea Creek, for a total length of about 3600 m. The displacement rate of this combined mass was quite high, so that the landslide toe evolved with velocities of several tens of meters per day (with peaks of 70–80 m/day) in the first month, and of several meters per day (with peaks of 13–14 m/day) from early May to mid-July 2013. In the crown area, the landslide completely destroyed a 450 m sector of provincial roadway S.P. 101, and its retrogression tendency exposed the villages of Capriglio and Pianestolla, located in the upper watershed area of the Bardea Creek, to great danger. Furthermore, the advancing toe seriously threatened the Antria bridge, representing the “Massese” provincial roadway S.P. 665R transect over the Bardea Creek, the only strategic roadway left able to connect the above-mentioned villages. With the final aim of supporting local authorities in the hazard assessment and risk management during the emergency phase, on 4 May 2013 aerial optical surveys were conducted to accurately map the landslide extension and evolution. Moreover, a GB-InSAR monitoring campaign was started in order to assess displacements of the whole landslide area. The versatility and flexibility of the GB-InSAR sensors allowed acquiring data with two different configurations, designed and set up to continuously retrieve information on the landslide movement rates (both in its upper slow-moving sectors and in its fast-moving toe). The first acquisition mode revealed that the Capriglio and Pianestolla villages were affected by minor displacements (at an order of magnitude of a few millimeters per month). The second acquisition mode allowed to acquire data every 28 seconds, reaching very high temporal resolution values by applying the GB-InSAR technique.This publication has 37 references indexed in Scilit:
- Geology, geomorphology and dynamics of the 15 February 2010 Maierato landslide (Calabria, Italy)Geomorphology, 2014
- Persistent Scatterer Interferometry (PSI) Technique for Landslide Characterization and MonitoringRemote Sensing, 2013
- Tracking and evolution of complex active landslides by multi-temporal airborne LiDAR data: The Montaguto landslide (Southern Italy)Remote Sensing of Environment, 2011
- Landslide monitoring with sensor networks: experiences and lessons learnt from a real-world deploymentInternational Journal of Sensor Networks, 2011
- LiDAR And Hyperspectral Data Integration For Landslide Monitoring: The Test Case Of Valoria LandslideItalian Journal of Remote Sensing, 2010
- Groundwater processes in a complex landslide, northern Apennines, ItalyNatural Hazards and Earth System Sciences, 2009
- The Valoria landslide reactivation in 2005–2006 (Northern Apennines, Italy)Landslides, 2007
- Large reactivated landslides in weak rock masses: a case study from the Northern Apennines (Italy)Landslides, 2006
- Investigation and monitoring in support of the structural mitigation of large slow moving landslides: an example from Ca' Lita (Northern Apennines, Reggio Emilia, Italy)Natural Hazards and Earth System Sciences, 2006
- Landslides in Emilia-Romagna region (Italy): strategies for hazard assessment and risk managementLandslides, 2005