A mathematical programming model for scheduling steelmaking-continuous casting production
- 16 January 2000
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 120 (2), 423-435
- https://doi.org/10.1016/s0377-2217(99)00041-7
Abstract
No abstract availableThis publication has 10 references indexed in Scilit:
- A scheduling environment for steel-making processesPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2003
- Scheplan-a scheduling expert for steel-making processPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2003
- Primary production scheduling at steelmaking industriesIBM Journal of Research and Development, 1996
- Hybridizing a genetic algorithm with rule-based reasoning for production planningIEEE Expert, 1995
- Inter-process synchronization in steel productionInternational Journal of Production Research, 1992
- Cooperative scheduling and its application to steelmaking processesIEEE Transactions on Industrial Electronics, 1991
- An expert system of automatic slab assignment for hot strip mill.ISIJ International, 1990
- A Scheduling Model for LTV Steel's Cleveland Works' Twin Strand Continuous Slab CasterInforms Journal on Applied Analytics, 1988
- Development of integrated production scheduling system for iron and steel worksInternational Journal of Production Research, 1977
- A mixed integer programming model for scheduling orders in a steel millJournal of Optimization Theory and Applications, 1974