Performance of Tunnel Feet-Lock Pipe (TFP) in Sharing Vertical Foundation Load
- 15 January 2021
- journal article
- research article
- Published by Springer Science and Business Media LLC in KSCE Journal of Civil Engineering
- Vol. 25 (3), 1086-1094
- https://doi.org/10.1007/s12205-021-1017-6
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- Deformation and mechanical model of temporary support sidewall in tunnel cutting partial sectionTunnelling and Underground Space Technology, 2017
- Displacement characteristics of high-speed railway tunnel construction in loess ground by using multi-step excavation methodTunnelling and Underground Space Technology, 2016
- Three dimensional numerical analysis of the effects of tunnelling near piled structuresKSCE Journal of Civil Engineering, 2014
- Ground Movements due to Shallow Tunnels in Soft Ground. II: Analytical Interpretation and PredictionJournal of Geotechnical and Geoenvironmental Engineering, 2014
- Design of sequential excavation method for large span urban tunnels in soft ground – Niayesh tunnelTunnelling and Underground Space Technology, 2013
- Analytical Study on the Control of Ground Subsidence Arising from the Phenomenon of Accompanied Settlement Using Foot Reinforcement Side PilePublished by American Society of Civil Engineers (ASCE) ,2010
- EXPERIMENTAL STUDIES ON TUNNEL SETTLEMENT REDUCTION EFFECT OF SIDE PILESDoboku Gakkai Ronbunshuu F, 2009
- Identification and prediction of deformation behavior around a shallow NATM tunnel using strain softening modelTunnelling and Underground Space Technology, 2006
- Tunnelling through an embankment using all ground fasten methodTunnelling and Underground Space Technology, 2005
- Construction of large cross-section double-tier Metropolitan Inter-city Highway (Ken-O-Do) Ome Tunnel by NATMTunnelling and Underground Space Technology, 2005