Research on Whole-Process Tensile Behavior of Headed Studs in Steel–Concrete Composite Structures
Open Access
- 19 May 2021
- journal article
- research article
- Published by Springer Science and Business Media LLC in International Journal of Concrete Structures and Materials
- Vol. 15 (1), 1-25
- https://doi.org/10.1186/s40069-021-00464-x
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (51890903)
This publication has 14 references indexed in Scilit:
- Influence of Surface Reinforcement, Member Thickness, and Cracked Concrete on Tensile Capacity of Anchor BoltsACI Structural Journal, 2017
- Tensile Capacity of Anchor Bolts in Uncracked Concrete: Influence of Member Thickness and Anchor’s Head SizeACI Structural Journal, 2017
- Buckling behavior of double-skin composite walls: An experimental and modeling studyJournal of Constructional Steel Research, 2016
- Analytical approach of anchor rod stiffness and steel base plate calculation under tensionStructures, 2016
- Rotational behaviour of column base plate connections: Experimental analysis and modellingEngineering Structures, 2014
- Modeling of anchor bolt pullout in concrete based on a heterogeneous assumptionNuclear Engineering and Design, 2011
- Linear Elastic Fracture Mechanics Pullout Analyses of Headed Anchors in Stressed ConcreteJournal of Engineering Mechanics, 2010
- Headed steel stud anchors in composite structures, Part II: Tension and interactionJournal of Constructional Steel Research, 2010
- Outrigger Beam–Wall Connections. I: Component Testing and Development of Design ModelJournal of Structural Engineering, 2004
- Anchorage to concreteProgress in Structural Engineering and Materials, 1998