RANCANG BANGUN IPAL (INSTALASI PENGOLAHAN AIR LIMBAH) PORTABLE UNTUK SKALA IKM DENGAN MENGGUNAKAN METODE TAGUCHI
Open Access
- 3 May 2019
- journal article
- Published by Universitas Ahmad Dahlan in SPEKTRUM INDUSTRI
- Vol. 17 (1), 51-60
- https://doi.org/10.12928/si.v17i1.9673