Cost and Time Analysis of the Acceleration Earthworks with the Method of Adding Heavy Equipment to the Depok-Antasari Toll Road Project
Open Access
- 3 February 2021
- journal article
- Published by Yayasan Ahmar Cendekia Indonesia in Quantitative Economics and Management Studies
- Vol. 2 (6), 345–354
- https://doi.org/10.35877/454ri.qems324