Risk-based estimate for operational safety in complex projects under uncertainty
- 1 May 2017
- journal article
- Published by Elsevier BV in Applied Soft Computing
- Vol. 54, 108-120
- https://doi.org/10.1016/j.asoc.2017.01.020
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (51378235, 71571078)
- Hubei Provincial Natural Science Fund (2014CFA117)
- Fundamental Research Funds for the Central Universities (2015M570645, 2016T90696)
This publication has 37 references indexed in Scilit:
- A novel fuzzy soft set approach in decision making based on grey relational analysis and Dempster–Shafer theory of evidenceApplied Soft Computing, 2015
- A probabilistic approach for safety risk analysis in metro constructionSafety Science, 2014
- Interval risk analysis for gravity dam instabilityEngineering Failure Analysis, 2013
- Uncertainty analysis of river flooding and dam failure risks using local sensitivity computationsReliability Engineering & System Safety, 2012
- Water quality evaluation based on improved fuzzy matter-element methodJournal of Environmental Sciences, 2012
- The internet of things (IOT) and cloud computing (CC) based tailings dam monitoring and pre-alarm system in minesSafety Science, 2012
- Design and Implementation of Tailings Dam Security Monitoring SystemProcedia Engineering, 2011
- A safety assessment of the new Xiangyun phosphogypsum tailings pondMinerals Engineering, 2011
- Floods from tailings dam failuresJournal of Hazardous Materials, 2008
- Reported tailings dam failures: A review of the European incidents in the worldwide contextJournal of Hazardous Materials, 2008