Studi Potensi dan Perencanaan Pembangkit Listrik Tenaga Mikro Hidro Di Bendung Simbang Kecamatan Doro Kabupaten Pekalongan

Abstract
The impact of greenhouse gas emissions is getting higher due to the use of fossil energy to drive power plants. Efforts to replace it is to develop renewable energy that is popular in Indonesia is micro hydro technology. This study aims to determine the potential of water energy and plant planning at Simbang Weir in Pekalongan. The method used combines water flow measurements with floating techniques and uses geographic information provided by Google Earth. The result of this research is that the water discharge is measured at 3.67 m3/s with a height of 11 meters. The turbine design uses crossflow with a potential power of 280.11 kW. The detailed engineering design is described in full in this study. Keywords PLTMH, water discharge, power potential Full Text: PDF References Boedoyo, M. S. (2008). Penerapan Teknologi untuk Mengurangi Emisi Gas Rumah Kaca. Jurnal Teknologi Lingkungan, 9(1). Sugiyono, A. (2006). Penanggulangan Pemanasan Global Di Sektor Pengguna Energi. Jurnal Sains & Teknologi Modifikasi Cuaca, 7(2), 15-19. S. Soewono, J. Pantouw, and S. Azzahra. (2017). Prakiraan Kebutuhan Energi Listrik Wilayah Jawa-Bali Tahun 2017-2036 dengan Gabungan Metode Analitis, Ekonometri, dan Kecenderungan. Energi & Kelistrikan, 9(2), 101-110. Pangestu, M. (2019). Studi Potensi Daya Listrik Bendungan Gerak Bojonegoro untuk Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Universitas Muhammadiyah Surakarta. Tobi, M. D., & Van Harling, V. N. (2017). Studi Perencanaan Pembangunan PLTMH di Kampung Sasnek Distrik Sawiat Kabupaten Sorong Selatan Provinsi Papua Barat. Electro Luceat, 3(1), 32-43. Farid, A. (2012). Studi Potensi Dan Perencanaan Sistem Pembangkit Listrik Tenaga Mikrohidro Di Sungai Guci Kabupaten Tegal. Engineering: Jurnal Bidang Teknik, 3(2). Chen, J., Yang, H. X., Liu, C. P., Lau, C. H., & Lo, M. (2013). A Novel Vertical Axis Water Turbine For Power Generation from Water Pipelines. Energy, 54, 184-193. Laia, I. (2018). Analisa Perencanaan PLTMH Pada Sungai Batang Palangai Gadang Kabupaten Pesisir Selatan Provinsi Sumatera Barat. Menara Ilmu, 12(10). Rompas, P. T. (2011). Analisis Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Pada Daerah Aliran Sungai Ongkak Mongondow di Desa Muntoi Kabupaten Bolaang Mongondow. Jurnal Penelitian Saintek, 16(2), 160-171. Nugroho, D., Suprajitno, A., & Gunawan, G. (2017). Desain Pembangkit Listrik Tenaga Mikrohidro di Air Terjun Kedung Kayang. Jurnal Rekayasa Elektrika, 13(3), 161-171. Nasir, B. A. (2014). Suitable Selection of Components for The Micro-Hydro-Electric Power Plant. Advances in energy and power, 2(1), 7-12. Sugiharto, A. (2018). PLTMH sebagai alternatif pembangkit listrik ramah lingkungan. Swara Patra, 8(1), 107-118. http://dx.doi.org/10.28989/avitec.v4i1.1132 Refbacks There are currently no refbacks.