REDESIGNING ASSEMBLY LINE BY APPLYING RANKED POSITIONAL WEIGHT AT HEAVY-INDUSTRIAL FACILITY

Hery Hamdi Azwir, Adji Fadjriawan Nugraha
Published: 16 October 2020
SPEKTRUM INDUSTRI , Volume 18, pp 133-144; doi:10.12928/si.v18i2.17801

Abstract: To meet customer demand, the company was faced with insufficient capacity problems caused by low efficiency and congestion on the assembly line. Recent data shows that there is an imbalance in the work process time between workstations. This study aims to solve these problems to achieve the desired capacity. The research begins by observing the operating time and collecting other data on the assembly line then analyzed and developed as a solution to these problems. The analysis results show that the assembly line has low line efficiency and the impact on the output target is not as expected. From the time observations made on the assembly line, it can be seen that the current line is inefficient and there is a bottleneck at some workstations. Ranked Positional Weight (RPW) was chosen as a line balancing method to solve the problem. RPW generates new work arrangements for each workstation that has relatively the same uptime. The results of the RPW method showed a significant increase in line efficiency, namely 75.03%, the smoothness index increased by 90.79%, and the balance delay was reduced by 90.52%. After the solution is obtained, a new layout is created to be used as a guide for rearranging the assembly line.
Keywords: capacity / assembly line / Line Efficiency / workstations / ranked / Solve / Rpw / Positional Weight

Scifeed alert for new publications

Never miss any articles matching your research from any publisher
  • Get alerts for new papers matching your research
  • Find out the new papers from selected authors
  • Updated daily for 49'000+ journals and 6000+ publishers
  • Define your Scifeed now

Share this article

Click here to see the statistics on "SPEKTRUM INDUSTRI" .
Back to Top Top