Abstract
It’s a compressive article consists of three parts, an overview of pipeline development in China, oil pipeline design for R oilfield and pipeline management suggestions. First, this article introduces the current status of pipeline construction, oil pipeline technology and gas pipeline technology in China in recent years. The current status of China’s pipeline construction is divided into three stages. In terms of construction, pipeline construction is developing in the direction of intelligence and modernization. Long-distance oil pipelines require technical breakthroughs in two aspects. One is the sequential oil product delivery technology to improve the type of oil that can be delivered sequentially; the second is the viscosity reduction delivery technology for heavy oil. Gas transmission pipelines are developing in the direction of high pressure, large diameter and high steel grade. Secondly, based on all the pipeline development above, in order to meet the development of R oil field, an oil-water two-phase pipeline transportation design and a pipeline crossing river design were carried out. Under the condition of the design pressure of the pipeline of 5.5MPa, it is preferable to produce a pipeline of φ219×6.5mm, and the steel grade of the pipeline is L360. A heating station and pumping station are needed in the transportation process, and the heating station and pumping station are combined for one construction. Considering that the strata of the river crossing section are mainly gravel sand layer, clay layer and non-lithological stratum, horizontal directional drilling (HDD) is adopted for river crossing, and suggestions are made for the construction process. Finally, after the pipeline was put into production, the corresponding auxiliary production system and supporting engineering suggestions were put forward.