Abstract
PPSDM Migas is a company engaged in oil and gas. One factor that must be considered by the company is the distribution of workload to employees so that the effectiveness and efficiency of employees can be reach. The fact in the field, PPSDM Migas has just transferred its employees to PPSDM Jakarta, so there is a discrepancy between workload and number o f employees. To overcome the problem of measuring workloads in PPSDM Migas, this study uses a task per task approach. This method will provide information about the allocation of employee human resources to complete the existing workload optimally. Based on the results of the workload measurement on PPSDM Migas using the task per task approach it can be concluded that from the two positions as a pilot project there was one position which resulted in a mismatch between the workload and the number of office holders, namely 4 Tank employees and Distribution but from the calculation results it takes 7 employees. The position of Executor of Distillation Operations has the number of employees as many as 2 employees and from the results of the calculation required 2 employees, this shows the suitability between the number of employees and the workload on the position. Based on the results of calculations from both positions, the position of Implementing Distillation Operations is included in the category of sufficient office efficiency. Whereas in the position of Implementing Tank and Distribution Installation get the medium category.